Mm Geomechanics | On Point

About Mm Geomechanics | On Point

Founded by Muliadi Merry, a passionate Principal Engineer, MM Geomechanics Pty Ltd has been established on the principles of serving clients with excellence and helping clients achieve their project goals and objectives. Muliadi has over 25 years international and national experience. His country experience includes Asia Pacific, United States of America and United Arab Emirates. Muliadi was a tunnel engineer upon graduation. Muliadi's fascination with multifaceted design, coupled with his communication skills, has later led him to become a project leader for a wide range of transport and infrastructure projects throughout New South Wales over many years. His road upgrade experience includes many major complex projects including but are not limited to WestConnex, NorthConnex, various stages of Pacific Highway, M1 and M4 Smart Motorway, and M1 Pacific Motorway to Raymond Terrace. His rail design experience is equally unrivalled, demonstrated by his extensive involvements in major light rail, heavy rail and freight rail projects, namely Sydney Light Rail, Canberra Light Rail, Glenfield Junction Alliance, South West Rail Link, Southern Sydney Freight Line, Southern Freight Link, Railway Corridor Protection Works and Dubai Metro. Muliadi has also worked in the building and construction industry. His project portfolio includes tall buildings Burj Al Arab and Burj Khalifa. MM Geomechanics provides ground engineering, project and delivery management and civil design advisory services.
Social Link - Linkedin: http://www. linkedin.com/company /mm-geomechanics
Employee Count: 7
Keywords: productivity

More about Mm Geomechanics | On Point

Mm Geomechanics | On Point is located at Pymble, New South Wales 2073, Australia
http://www.mmgeomechanics.com.au